皇冠博彩app
热门标签

免费足球推介网(www.hgbbs.vip):Fukushima debris removal delayed by another year

时间:1个月前   阅读:3

皇冠APP下载www.hg108.vip)是一个开放皇冠即时比分、皇冠官网注册的平台。皇冠注册平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

免费足球推介网www.hgbbs.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的免费足球推介网。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:皇冠投注平台出租:Bursa rises cautiously ahead of Jackson Hole meet

下一篇:ETH单双博彩(www.eth108.vip):Aaron-Wooi Yik storm into World Championships final

网友评论